Cutting Force provided extensive Road / Wall sawing, large core drilling and hydraulic hand/ring sawing for the modernization and total refurbishment of the Traralgon Water Treatment Plant 2005/2006.

Works covered a fulltime period of approximately three months and entailed confined space drilling and sawing, the removal of approximately 84 tonnes of concrete in total and the drilling of 8 large core holes up to 800mm in diameter.

Client: Gippsland Water, Traralgon Victoria and Ferguson Contractors.